Commercial Services

Our skilled team specialises in high-quality fencing and groundwork for commercial and housing developments. We offer a wide range of groundworks services, including site clearance, excavation, earthworks, drainage solutions, foundation construction, kerbing, edging, and utility trenching. Along with all the finishing services including paving, resin bound installation, block paving, fencing and more.

All services are tailored to meet your specific project needs. We follow strict safety protocols and industry standards to ensure the highest level of professionalism and quality in every project we undertake.

Contact us for a no obligation discussion about your requirements, we will be happy to answer any queries or questions you may have.

Please contact us on 01454 805808 or email  info@gellandscaping.co.uk.

Commercial Services Offered:

Installation of Various Paving Surfaces

We install high-quality paving solutions for commercial sites, access roads, footpaths, and public spaces.Expertise in installing different types of paving surfaces everything from block paving to porcelain paving to meet diverse client needs.

Driveway and Pathway Design, Installation, and Repair

Comprehensive services covering all aspects of driveway and pathway projects.

Resin Installation

An approved installer of Addagrip quality resin surfacing systems.

Fencing, Gates, and Perimeter Work

Installers of all aspects of fencing, delivering security and visual appeal for a wide range of commercial and residential sites.

Storm & Foul Drainage

We install effective storm and foul drainage systems to prevent flooding and ensure proper water management.

Earthworks

Our earthworks services include excavation, grading, and land preparation to provide a solid foundation for your project.

Mass and Reinforced Concrete Work

We install high-quality mass and reinforced concrete solutions for foundations, structures, and pavements, built to last.

Why Choose GEL Landscaping and Groundworks for Hard Landscaping?

Experienced Team – Our skilled professionals bring decades of experience to every project, ensuring quality workmanship.

Comprehensive Services – From initial ground preparation to final touches, we offer a full range of services to meet your needs.

Client-Focused Approach – We prioritize your requirements, working closely with you to deliver results that exceed expectations.

Insured – Fully insured, we adhere to industry standards for safety and quality.

Commercial Services from Gel

Case Studies

Case Study Muller Group - Removal and Installation of Floodlights

This case study examines the successful removal and installation of new floodlights for Muller Group. The goal was to remove and reinstate new floodlights, the previous floodlights had been damaged by lorries hitting them, Muller Group required a replacement of new heavy duty floodlights.
Challenges

Prior to the new strategy, Muller Group faced several challenges:

  • Operating a 24 hour site proved challenging with poor visibility.
  • Lorries arrive onsite to off load and reload, this was particularly difficult with limited visibility.
  • Increased site safety risks.
  • Operational issues as only a limited number of shunters could be operational.

The installation focused on regular communication with the onsite manager and Intermech to ensure that whilst the installation took place the site could still be operational.

  • Planning: Several meetings were held to plan the installation. Risk assessments, permit to break ground and method statements were completed. Great consideration was given to the timing of plant deliveries, storage of materials and timescales to ensure the electricians had access when required.
  • Removal: We lifted out the old floodlights using a 6T excavator and lifting strops. Once the floodlights had been removed the electricians came to check the cables were suitable for the new floodlights.
  • Disposal: The old floodlights were cut into smaller more manageable sections, using a disc cutter and disposed of off site.
  • Breakout: The existing concrete was broken out using a breaker attachment and the 6T excavator, all debris was removed from site and disposed of.
  • Reinstatement: A new concrete base approximately 600mm deep 600mm wide was installed for each new floodlight. Shuttering was built onsite and fitted then the concrete was poured and allowed to cure. Threads for the new floodlights were set into the concrete. The new heavy duty floodlights were lifted into place using the excavator and the lifting strops. Once in place the floodlights were bolted in place using the threads previously installed. After our installation the cables were connected by the electricians with no issues.

The new floodlights were removed and installed within three weeks, working within the agreed timescales. The site is now fully operational.

With the site operating 24/7 along with working externally and with large goods vehicle movements, careful planning and traffic management was required. Adam (GEL Landscaping and Groundworks) and his team were very professional, they gave updates daily on progress and adhered to the H&S rules on site at all times.

We would recommend and will be using the Gel team again!

Intermech Ltd

Paul Heatherington - Director

The successful implementation of new floodlights at Muller Group's Bridgwater site demonstrates that by focusing on personalised communication, robust planning, and timescale management, GEL Landscaping and Groundworks achieved a successful project delivery.

For more information, please contact Gel Landscaping at GEL Landscaping Centre, Oakleigh Green, Westerleigh Road, Bristol, BS37 8QZ.